Dexgreen - July 03, 2017
When using Dexgreen closures in the telecommunications network, it is imperative to follow all outlined work instructions.
Always Clean – Abrade – Clean cables and inner surfaces of closure to allow sealant to bond.
It is Critical to separate and retain cables while sealant is setting for 20 or 30 minutes
To download the latest installation guide overview flyer, which also includes instructions for remaking closures, please download from the following link.
Installation of Dexgreen Closures QRG, NBN Installation of Dexgreen Closures QRG, Telstra
In summary, adhering to the following steps for installing new closures will ensure correct installation
Following the outlined procedures and adhering to the high level of best practice, will ensure compliance in the Telstra and NBN copper access network.